Peel Group Waste Processing Centre - Manchester

Project Overview

CLIENT :

CDE Global Limited

END USER :

Peel Group

APPLICATION :

100 Tonne/HR Waste Processing

SCOPE OF SUPPLY :

  • Cable Containment
  • Cable Installation & Glanding
  • Instrumentation & Local Isolation
  • Interlinking Between Control Panels & MCCs
  • LV Power & Local Lighting

Speak to
a Specialist

PCS has been designing, installing, maintaining and inspecting electrical solutions since 1997. Call PCS to lighten your load.