Breedon Hope Cement Works

Project Overview

CLIENT :

Breedon

END USER :

Breedon Hope Cement Works

APPLICATION :

MRD Workshop

SCOPE OF SUPPLY :

  • Walk-around with the client to confirm locations for all new equipment, containment routes, and access requirements across the MRD building
  • Installation of 600mm cable tray throughout the main workshop, 300mm tray in the mechanics workshop, and 150mm tray drops to isolators, transformers, 415V sockets, and light switches
  • Mounting of the Schneider 630A PowerPact board, two Schneider 250A 24-way Acti9 boards, one 250A 8-way Acti9 board, and a bespoke lighting control panel fabricated on site
  • Full cable pulls throughout the installation, all final terminations completed, and connection of the parallel 150mm 4-core supply cable with a 120mm separate earth from the onsite substation       
  • Full Electrical Installation Condition (EIC) report carried out across the entire installation. All relevant documentation completed and formally handed over to the client

 