Ballidon Quarry
Project Overview
CLIENT :
Tarmac
END USER :
Ballidon Quarry
APPLICATION :
Ballidon pontoon pump installation
SCOPE OF SUPPLY :
Supply of a containerised MCC room to house the VSD panels, that control the pontoon pump and booster bump
A 280KW VSD starter panel was provided by PCS
The installation of a pontoon pump 56KW and in-line booster pump 280KW (Due to the length & incline of Pipework) to extract water from the Quarry Bottom up to the plant for use and storage
Speak to
a Specialist
PCS has been designing, installing, maintaining and inspecting electrical solutions since 1997. Call PCS to lighten your load.













