Ballidon Quarry

Project Overview

CLIENT :

Tarmac

END USER :

Ballidon Quarry

APPLICATION :

Ballidon pontoon pump installation

SCOPE OF SUPPLY :

Supply of a containerised MCC room to house the VSD panels, that control the pontoon pump and booster bump

A 280KW VSD starter panel was provided by PCS

The installation of a pontoon pump 56KW and in-line booster pump 280KW (Due to the length & incline of Pipework) to extract water from the Quarry Bottom up to the plant for use and storage